Kirkham Road, Heald Green
Manchester Road Surfacing recently carried out the following works:
- Break out tie in at front & rear of existing drieway and break out badly damaged areas.
- Saw cut down sides of concrete.
- Supply & lay block paving to side of driveway to form edgind.
- Reset edgings to right hand side of drive.
- Apply tack coat bonding emulsion.
- Regulate low areas.
- Supply & lay 6mm surface course to a depth of 30mm.
- Replace manhole cover & frame.