Kirkham Road, Heald Green

Manchester Road Surfacing recently carried out the following works:

  • Break out tie in at front & rear of existing drieway and break out badly damaged areas.
  • Saw cut down sides of concrete.
  • Supply & lay block paving to side of driveway to form edgind.
  • Reset edgings to right hand side of drive.
  • Apply tack coat bonding emulsion.
  • Regulate low areas.
  • Supply & lay 6mm surface course to a depth of 30mm.
  • Replace manhole cover & frame.